CDM Project Activity List (Verification)
| Monitoring Period | Ref No. : Project Name | Host Party | Sectoral Scope | Outline |
|---|---|---|---|---|
| 01 May 10 - 31 Mar 11 |
1869 : Inner Mongolia Chifeng Dongshan Phase II 50MW Wind Power Project |
China | 1 | The project is located in Danianzi town, Songshan District, Chifeng City, Inner Mongolia Autonomous Region. It involves the installation of 25 turbines, each of which has a rated output of 2000kW, providing a total capacity of 50MW. The estimated annual GHG emission reductions are 140,451tCO2e. |
| 01 May 10 - 31 Mar 11 |
1830 : Inner Mongolia Chifeng Bolike 50MW Wind Power Project |
China | 1 | The project is located in Xiahaba Village, Keshiketeng Qi, Chifeng City, Inner Mongolia Autonomous Region. It involves the installation of 58 turbines, each of which has a rated output of 2000kW, providing a total capacity of 50MW. The annual output of the proposed project is estimated to be 122,848MWh.The estimated annual GHG emission reductions are 139,064tCO2e. |
| 01 Jun 10 - 28 Feb 11 |
2872 : Taibai Guanyinxia Hydropower Station |
China | 1 | This project is located on the Xushui River Basin which is the main branch of the Hanjiang River, in Taibai County, Shaanxi Province. The project is a new diversion type hydropower station with seasonal regulating capacity reservoir. The total installed capacity is 26MW, and the surface area of the reservoir at full water level is 0.32km2[1], therefore the power density is 81.25W/m2. The project will reduce GHG amount to 74,453tCO2e annually. |
| 01 Jun 10 - 28 Feb 11 |
1388 : Yunnan Dali Yang_er 49.8MW Hydropower Project |
China | 1 | This project is a diversion-type hydropower project. It is located on the Heihuijiang River in Yangbi Yi Nationality Autonomous County of Dali Bai Nationality Autonomous Prefecture, Yunnan Province. The surface area at full reservoir level of the Project is 10.75 X 104m2, and the power density is about 463.3W/m2. The Project will reduce 140,755 tons CO2 equivalent of anthropogenic emissions of GHGs annually. |
| 28 Jan 10 - 24 Dec 10 |
2541 : Fujian Hua`an Mianliang Hydropower Project |
China | 1 | The project is a riverbed-type hydropower station, located on Beixi stream, one of the main branches of Jiulongjiang river in the Hua`an County, Zhangzhou City of Fujian province. Within the project activity, two sets of water turbine and generating units, which are made and supplied by a domestic manufacturer, will be installed at the site with a total generation capacity of 44 MW (2 X 22MW). The estimated annual GHG emission reductions by the project activity are 147,461 tCO2 equivalents. |
| 26 Apr 10 - 28 Feb 11 |
0996 : Zhoubai Hydroelectric Project |
China | 1 | The Project is located in the town of Zhoubai, Qianjiang District, Chongqing City. Total installed capacity of the Project will be 22 MW, consisting of two (2) 11MW turbines, with a predicted power generation of 80,140 MWh/yr. The annual power delivered to the grid is 75,030 MWh/y. The project is expected to reduce emissions of greenhouse gases by an estimated 58,051 t CO2e per year during the first crediting period. |
| 26 Jul 10 - 28 Feb 11 |
1226 : Youshuishiti Hydroelectric Project |
China | 1 | The Project is a new reservoir type hydropower plant, with a power density of 12.37 W/m2. The installed capacity of the Project is 120 MW. The purpose of the proposed project is to utilize hydrological resources to provide electricity to the power grid. The project is therefore expected to reduce emissions of greenhouse gases by an estimated 309,210 t CO2e per year during the first crediting period. |
| 01 Jun 09 - 30 Jun 10 |
1732 : Fuzhou Hongmiaoling Landfill Gas to Electricity Project |
China | 13 | This project is a landfill gas (LFG) collection and utilization project in Fuzhou City, Fujian Province. The project involves the installation of a gas collection system, leachate drainage system, flaring equipment and an electricity generation plant at Fuzhou Hongmiaoling Landfill. The estimated emission reductions will be 37,914CERs per year in average. |
| 22 Aug 09 - 11 Jan 11 |
2213 : Luoyingkou Hydropower Project in Heping County Guangdong Province, China |
China | 1 | This project in Heping County Guangdong Province is a run-of-river hydropower project with low water head. The project has a total installed capacity of 18MW (3 X 6MW), with the annual operation hours of 3,564h and the power generation of 64,160MWh and the annual grid-connected electricity of 58,532 MWh1. The average annual emission reductions of the project are estimated to be 49,360 tCO2e. |
| 26 Apr 10 - 31 Dec 10 |
1222 : Xiangziyan Hydroelectric Project |
China | 1 | The Project is a new reservoir hydropower plant. The installed capacity of the Project is 32 MW, with a reservoir with storage capacity of 1,489 million m3. The project reservoir has a flooded area of 1.82 km2 and a power density of 17.58 W/m2. The purpose of the proposed project is to utilize existing hydrological resources to generate electricity. The project is therefore expected to reduce emissions of greenhouse gases by an estimated 81,720 t CO2e per year during the first crediting period. |
| 15 Jul 10 - 06 Dec 10 |
2572 : Wastewater treatment with Anaerobic Digester at Viet Ma starch processing plant in Tay Ninh,Vietnam |
Vietnam | 1, 13 | The project involves the installation of an anaerobic digester with biogas extraction capacity for the treatment of organic wastewater treatment of Tapioca starch processing plant of Viet Ma Co., Ltd located in Tay Ninh Province .The project is expected to reduce 39,814 tCO2 /year. |