Japan Quality Assurance Organization (JQA)

Detail of Project

Project Name Pure-low Temperature Waste Heat Recovery for Power Generation (2x7MW) in Guangdong Tapai Cement Co., Ltd. ("the Project" or "the Project Activity")
Country China
Sectoral Scope 1, 4
Description The Project Activity involves the construction of two 7MW waste heat recovery electricity generators, one for each of two new 4500t/day dry process clinker production lines already under construction at the Huizhou Longmen Cement Plant (the Longmen Plant) owned by Guangdong Tapai Group Co., Ltd. (Tapai Group), and situated in Longmen County of Guangdong Province, PR China. The Project Activity will recover and use the waste heat from the rotating kilns of the cement clinker lines and lead to the mitigation of greenhouse gas emissions through the generation of electricity which will be used to displace electricity imported to the cement plant from the Southern China Power Grid.
The completed generators are expected to produce in the region of 86,400 MWh per year, 8% of which will be used in the Project Activity, and the remainder, 79,488 MWh, will be available for use by the cement plant, which should meet approximately 28% of the plant's needs. Displacement of this amount of electricity from the local grid will lead to a reduction in greenhouse gas emissions by the grid-connected generation facilities of approximately 63,551 tCO2/year, leading to a total reduction of 444,857 tCO2 over the first seven-year crediting period.
PDD PDF (1.12MB)
Public Comment Start date 2008/04/11
Close date 2008/05/10
Comment Received 0
Open for Comments Closed

Copyright(c)2007 JAPAN QUALITY ASSURANCE ORGANIZATION All right reserved.